We just exported one set of stringing equipment 9 ton hydraulic puller SA-YQ90D with hydraulic puller tensioner SA-YQZ40C with some tools recently.
The equipments are tested according our standard procedure: First, load test, Second, overload test, Third, high speed tension stringing test.
Machines are loaded and fixed in the container with steel wire rope.
Conductor Stringing Blocks with grounding rollers are loaded into container
Transmisssion line stringing Tools are loaded into container
The equipments are tested according our standard procedure: First, load test, Second, overload test, Third, high speed tension stringing test.
Machines are loaded and fixed in the container with steel wire rope.
Conductor Stringing Blocks with grounding rollers are loaded into container
Transmisssion line stringing Tools are loaded into container